Who is best Tubewell Drilling Contractor In Delhi?

 Welcome To DILIGENT DRILLTECH INFRA PRIVATE LIMITED 

We are one of the foremost Tubewell Drilling Contractor In Delhi and Borewell Services in Delhi always offer catered to the requirement of our customers

Tubwell Drilling Contractor

We offer services for tubewell drilling Contractor in Delhi with our capacity of drilled water well up to a maximum of 27 inches in diameter, and up to 1500 feet depth. We cater to varied different types of drilling of varied formulations. Our organization has successfully executed work on some of the most difficult underground formations in India. With the aid of our infrastructural set up, we have executed the works in most of the areas with the maximum capacity.

Some of the jobs handled by our team includes:
(1). Domestic tubewells up to 12” in diameter are construction and installation on site by our engineers
(2). Pressurized water supply systems including filtration and UV treatment are available on request

Reverse Rotary Drilling Services

Reverse circulation is achieved by blowing air / water down the rods, the differential pressure creating air lift of the water and cuttings up the inner tube which is inside each rod. It reaches the bell at the top of the hole, and then moves through a sample hose which is attached to the top of the cyclone. The drill cuttings travel around the inside of the cyclone until they fall through an opening at the bottom and are collected in a sample bag.

RC drilling is air-powered, water is also used, to reduce dust, keep the drill bit cool, and assist in pushing cutting back upwards, but also when collaring a new hole. A mud called liquid-pol is mixed with water and pumped into the rod string, down the hole. This helps to bring up the sample to the surface by making the sand stick together. Occasionally, 'super-foam' (AKA 'quick-foam') is also used, to bring all the very fine cuttings to the surface, and to clean the hole. When the drill reaches soil, a collar is put down the hole around the rods which is normally PVC piping. Occasionally the collar may be made from metal casing. Collaring a hole is needed to stop the walls from caving in and bogging the rod string at the top of the hole. 


Contact us ---- 9868753468

Company Location ----  410, 4th floor, Uppal South End, Sector – 49, Near - Sohna Road, Gurgaon -122018 Haryana



Comments

Popular posts from this blog

Which is the best Tubewell Drilling Services Punjab? 

What is Google Promotion Services

What is website design and branding